4.3.3 System #2 (Exterior): Post-Coating Maintenance & Care
**NOTE**: Clean with water only for the first five days after the coating installation. After five days, most exterior horizontal concrete or paver type surfaces can be easily cleaned by simple hose rinsing with tap water. A pressure washer is also an efficient means for periodic cleaning. If needed, use a pH Neutral Cleaner (no [...]